The Super Trishuli Hydropower Project (STHP) is a Run-of-River Project (ROR). The project is designed for an installed capacity of 100MW and is proposed to be developed in the lower reaches of Trishuli River. The proponent of the STHEP is the Blue Energy Pvt. Ltd.
NESS has completed the ESIA study of the project.